The SecureStrux NIPRNet Project Plan

The standard SecureStrux approach for NIPRNet services is a five-phase approach (see the steps below). The SecureStrux Team Lead provides project management of the project scope for all phases with high-level insight into the NIPRNet enclave project requirements at project initiation. SecureStrux meets with all appropriate site personnel and senior leadership to introduce team members, obtain proper logical and physical access, and verify any technical details needed to install and configure the enclave. Our support efforts provide and satisfy the requirements for:

  • End-user secure baseline images with baseline applications and all applicable patches, updates, and drivers pre-installed
  • Offline media with backup configurations of all equipment
  • Documentation, policy, and procedures required to receive an Authorization to Operate (ATO), Approval to Test (ATT), Authorization to Connect (ATC) as per the applicable DoD Office
  • Configuration of equipment and software following applicable federal, Defense Counterintelligence and Security Agency, and DISA STIGs to receive node certification and accreditation/ authorization
  • Training to appropriate personnel on the operations, maintenance, and configuration of all infrastructure and workstation equipment